For working software with demand evidence and a buyer path that is leaking. We diagnose the bottleneck, implement one measurable fix, instrument it, and leave the next 30 days ordered.
Five focused daysOne agreed repairMeasured before and afterRollback included
01 / FIT
Built for a leak, not a resurrection.
The sprint starts with an operating product and real evidence that somebody wants it. It does not manufacture demand for a pre-launch codebase.
Good fit
A working SaaS, browser extension, developer tool, or desktop app.
At least one real demand signal: users, installs, revenue, traffic, reviews, or an engaged list.
A measurable leak in pricing, activation, onboarding, checkout, retention, or reactivation.
A founder who can approve access, scope, and release decisions quickly.
Not this sprint
Full redesigns, migrations, or feature-roadmap builds.
Products without users, installs, traffic, revenue, reviews, or a reachable list.
Regulated finance, medical decisions, gambling, adult content, crypto custody, or sensitive-data dependence.
Requests for guaranteed revenue, rankings, conversion lifts, or fundraising outcomes.
02 / THE FIVE DAYS
00
Before day one
Confirm the scope, baseline metric, access plan, and rollback owner.
01
Day one
Trace the buyer path and identify the highest-confidence revenue leak.
02
Day two
Choose one repair using evidence, implementation risk, and measurement speed.
03
Days three and four
Implement the repair, add instrumentation, test failure paths, and prepare rollback.
04
Day five
Ship or hand off the production-ready change, reconcile evidence, and deliver the 30-day plan.
03 / DELIVERABLES
A repair you can inspect.
The scope is accepted only when the target metric, product surface, access plan, and release owner are written down. Revenue improvement is the objective, not a promised result.
1A written baseline and diagnosis tied to observable behavior.
2One implemented high-leverage repair inside the agreed product surface.
3Instrumentation for the primary success and failure events.
4A tested release or production-ready handoff with rollback instructions.
5A 30-day experiment plan ordered by expected value and effort.
04 / ACCESS
Least privilege. No customer-data handoff.
Diagnosis begins with public surfaces, screenshots, and read-only aggregate analytics. Code, staging, payment, or release access is requested only when the written scope requires it.
Credentials are never collected through this application form. Customer records, message content, payment details, health data, and private user files are outside the sprint.
05 / TERMS IN PLAIN ENGLISH
What buying the sprint means.
Is revenue guaranteed?
No. The sprint guarantees the agreed work and evidence package, not a commercial outcome we cannot control.
What if the diagnosis finds a larger rebuild?
We stop scope drift, document the finding, and select the best repair that still fits the five-day boundary.
When is payment requested?
Only after both sides approve a written scope, access plan, acceptance criteria, and start date.
Who owns the work?
The engagement scope must define ownership and reuse rights before access begins. The application itself grants no rights.
06 / REQUEST THE SPRINT
Show us the leak and the evidence.
Applying is free. We will accept only products where one meaningful repair can be scoped, shipped, and measured responsibly.